Infrastructure Stabilization and hydro isolation of the sewerage collection well of the city of Jurmala Re-levelling and stabilization of the concrete slabs of the Niitvalja railway crossing Tramway stabilization and re-levelling in the center of Tallinn Stopping the subsidence of Riga tramway, restoring its bearing capacity and re-levelling the concrete slabs Strengthening of the pier concrete supports of port of Helsinki Soil compaction of the retaining wall of Nasva harbor and pier hydro isolation Soil compaction of the port of Sviby quay and stabilization of the access ramp Stabilization of the subsided soil and increasing the bearing capacity of the Tallinn roundabout road (Kurna – Luige road section) 1 2 »